Skip to product information
1 of 5

HOMCOM Set of Two Floating Bedside Tables, Wall Mounted Nightstand with Drawer and Open Shelf, High Gloss White

HOMCOM Set of Two Floating Bedside Tables, Wall Mounted Nightstand with Drawer and Open Shelf, High Gloss White

Estimated delivery window

Calculating... – Usually delivered within 5–7 working days.

Shipping

Free UK Delivery

Returns

Easy 30 day returns

Regular price £21.38
Including VAT
Taxes included. Shipping calculated at checkout.
Colour
Quantity
View full details

Designed to keep everyday things in order, this bedside table gives you double the storage for a single package. Set up together in the same space or just separately: do it your way.

Made from particle board, each nightstand is solid, with a drawer and an open shelf, with a flat top: plenty to hold bedtime essentials. Fixed to the wall, no floor space is required for these floating nightstands. Floating design frees up floor space and fits any height you prefer. Slide-out drawer plus open shelf give easy-access storage.

Key Features

  • Slide-out drawer plus open shelf provide easy-access storage
  • Particle board structure built
  • High gloss white finish

Product Benefits

  • A drawer keeps smaller items tucked away but close at hand.
  • A shelf adds a handy spot for smaller items.
  • The board construction gives a smooth, even surface that suits everyday indoor use.
  • Wall mounting frees up floor space, keeping a smaller room feeling open.

Product Specifications

  • Product type: Storage Cabinets
  • Material: Particle Board
  • Colour: High Gloss White
  • Maximum load: 11kg (total), 3kg (drawer). 3kg (shelf)

Dimensions & Sizing

  • Width: 37 CM approx
  • Height: 21 CM approx
  • Depth: 32 CM approx

More sizes

  • Drawer Inner Size: Width 29 × Height 6 × Depth 23.5 CM approx
  • Open Shelf Size: Width 34 × Height 8.5 × Depth 30 CM approx

Packaging & What’s Included

  • 2 x Floating Bedside Table
  • 1 x Manual

Assembly

Assembly required.